From JDS Live Report On Berth
On 9th April, two sets of machinary including two overweight pieces of which are 135MT and 120MT completed lifting on board successfully at the berth of 9th district of SHA port. Thanks for the co-operation from SIPG and Sinotrans.
All of these bulk pieces are to be shipped to Mumbai for the engineering project in India.